The process of creating a data center is multi-stage. It carries the following steps:
- Creation of technical specifications and construction project. Without this stage, the whole idea of creating a data center is doomed to failure. Therefore, special attention must be paid to it. The goals, methods and means for creating this project should be worked out in detail. As a result, a site for construction is selected that meets all the necessary requirements.
- Coordination of all elements of the data center in order to create a single complex and put it into operation. In other words, this is the solution to the tasks set at the planning stage of the data center. In addition, various risks are calculated during the commissioning of the data center and ways to reduce them. The necessary documentation is being prepared related to the functioning of individual components: hardware, software, engineering systems. The entire design process ends with the creation of a project, which is agreed with the customer and with regulatory authorities.
- The stage of equipment supply, installation, implementation of the main components, testing them and creating an organizational structure.
- The stage at which the verification of all systems passes. Server hardware is being maintained. As a result of the checks, the journal of planned activities is filled.
- The stage of structural and technical changes in the data center aimed at improving its performance. To do this, it is necessary to carry out the process of modernizing the IT infrastructure on time.

One of our customers set us the task of building a reliable and secure data center, which will include a whole range of IT solutions, high-tech equipment and engineering structures. All this will be aimed at the operational processing of data and the safe storage of information.
When creating the data center, we took into account:
- The building structures of the building and the future server room, which must meet the requirements of the standards for the bearing capacity of the floors, fire resistance, etc.
- Carrying out the necessary external communications - power supply, communication channels, etc.
- Construction inside the building and premises of fault-tolerant engineering infrastructure.
During the project, work was carried out on:
- installation of raised floor
- power supply for air conditioning
- installation of an automatic gas fire extinguishing system and fire alarm
- power supply of data centers from TP and DGU
- installation of emergency and main lighting systems
- installation of a supply and exhaust ventilation system
- installation of SCS and telecommunication cabinets
- the launch of an environmental monitoring system




For the customer, not only quality of work, but also speed became a critical factor. Therefore, installation work of external and internal engineering systems continued even under quarantine, observing all safety precautions:
• Use of disposable medical masks and respirators
• Hand washing with soap and water
• Use of antiseptics
• Disinfection of gadgets, tools, and surfaces that have been touched
We would like to note that every year customers' requirements for equipment and services are growing - this encourages us to develop new solutions, optimize existing equipment, and increase the level of service and engineering.
Our company provides a range of services for the creation of a competent engineering and information infrastructure of the data center, from pre-project surveys, writing technical specifications for the development of project documentation and ending with the supply of equipment and the construction of architectural solutions for the data center, the creation of engineering and information infrastructure, and the connection of all necessary uninterrupted and guaranteed power supply, SCS, cooling and ventilation of air and security systems such as video surveillance, security and fire alarms, access control and management system, monitoring system, as well as an automatic gas fire extinguishing system.
Our experts take care of all stages of the project, including subsequent technical support and maintenance.